top of page
GM Cole Engineering Bldg 01.jpg
20211110_111246_edited.jpg
GROWTH + COLLABORATION
MEGA-BUILDING WORKPLACE RENOVATION


COMPLETED CONSTRUCTION
CONFIDENTIAL CLIENT



SMITHGROUP DETROIT
2020-2022

In 2015, SmithGroup partnered with a confidential American multinational automotive manufacturing company to systematically renovate a 2.3 million gross square foot campus mega-building in six consecutive stages. This renovation transformed the existing office environment from small cubicle spaces and private offices into a modern, agile work environment that aligns with the client's design principles of openness, collaboration, flexibility, identity, and well-being. This transformation allowed a more efficient use of square footage dedicated to amenities, collaboration spaces, and breakout rooms to better support these core design principles.

​Although I was involved briefly in previous stages of the building renovation, in January 2020 I was honored with the position of Architectural Design Lead for Stage 6; the largest of all the stages at 430,000 square feet. This square footage sprawls across three building additions, four floors, and includes major design and branding opportunities within and surrounding the main entry lobby.

​As design lead, my responsibilities included directing the architectural discipline team members and interdisciplinary coordination with the larger team to ensure my design was implemented and integrated. I provided leadership and assisted in mentoring junior team members throughout the design process. I assisted in establishing project timelines, staffing requirements, and defining roles and responsibilities of internal team members. I established, managed, and maintained project design goals and developed the conceptual design framework for the sixth stage of renovation. I implemented space planning strategies to improve user experiences and created branding identities through architectural expressions of the space.

​Throughout the project, I was responsible for composing presentations for client leadership meetings and funding approvals. I communicated designs to the client both orally and graphically on a regular basis. I have fostered and maintained effective and productive relationships with both the client and contractors. I prepared written communications to iterate design ideas, project documentation, and contracts. I have consistently resolved conflicts and provided creative solutions throughout the design and construction process. I have also been responsible for observing site conditions during construction to ensure the project’s conformance with the design intent.

​This project could not have succeeded without the extensive team that worked so hard to prepare and deliver construction documents and building information to our client and contractors. This was one of the largest collaborative efforts I have ever been involved in and I had the pleasure of working with outstanding individuals that continuously offered opportunities for me to learn and understand different perspectives of design. I continue to be honored and impressed with the final product of our labors.

​Throughout this project, and many other projects for this client, I have established procedures and protocols for project workflows to ensure consistency in SmithGroup deliverables. I pride myself on being an expert on this particular workspace environment and the client expectations associated with their many campus renovation projects. I have fostered and maintained effective and productive relationships with the client during my career at SmithGroup.

GM Cole Engineering Bldg 10.jpg
BEIGE BEFORE_edited.jpg
EXISTING CONDITIONS 
IMG_1954_edited.jpg
TRANSFORMED SPCAES
PROJECT PROPOSAL IMAGES
PRS COMBINED DESIGN REVIEW DIAGRAMS Page 055.jpg
DIAGRAMS:
MOMENTS OF COMMUNITY ENGAGEMENT
PRS COMBINED DESIGN REVIEW DIAGRAMS Page 031.jpg
DYNAMIC PLACES:
PRECEDENTS, STAGES 1-5
PRS COMBINED DESIGN REVIEW DIAGRAMS Page 030.jpg
DYNAMIC PLACES:
STAGE 6
PRS COMBINED DESIGN REVIEW DIAGRAMS Page 041.jpg
CONSTRUCTION DOCUMENTATION
DRW COMBINED WORKING DRAWING SHEETS Page 003.jpg

SMITHGROUP PROJECT TEAM

MICHAEL WEINGARTS, PRINCIPAL IN CHARGE

MICHAEL SKALSKY, PROJECT MANAGER

JUSTIN FIEMA, PROJECT MANAGER

STRUCTURAL ENGINEERING

ZY LIU, STRUCTURAL PROGRAM LEAD

LESLIE FACCENDA

MICHAEL DUFFIELD

SUSIE CHUNG

ANDREA REYNOLDS

TIESCHIA HILL

SHAWN WADDELL

PAULA MARLOWE

 

ARCHITECTURE

MICHAEL PAUL KRUG, ARCHITECTURAL PROGRAM LEAD

DAVE PEZDA, PROJECT ARCHITECT

ROB STACHERSKI, PROJECT ARCHITECT

ABI ARAGON, DESIGN LEAD

KIRK YUHASZ, CONSTRUCTION ADMINISTRATION LEAD

PAIGE HOLCOMB

CHRIS PINE

ZANE BIRENBAUM

LING HONG

BRYAN SEEF

LUIGI COLETTA

DENNIS DUKU

XIANG WEI

VLAD CHERTIC

STEPH ANDERSON

ANDRE SHARON

CHRISTIAN MUELLER

MARK GOYETTE

KATELYN ROSSIER

MARIJA DORIC

MIKE RUTHERFORD

PAUL LOCHER

CHARLIE HARRIS

LAURA HOLMAN

SHUO LI

JASON ROBINSON

PATRICK KANARY

BOB VARGA

STEVE LODGE

ANDREW MANNION

SANDY LAUX

BILL MOORHEAD

HAYDEN JUERGENS

EVERRITT PHILLIPS

CARRIE KUKLA

BRITTANY EWING

BUILDING TECHNOLOGY

ERIC SASSAK, BUILDING TECHNOLOGY LEAD

PAUL JOHNSON

JUAN ARIAS

LINDSEY WAUGH

MARK PIOTROWSKI

AJ NOTO

INTERIOR DESIGN

JENNIFER PLAGENS, INTERIORS PROGRAM LEAD

CARA FOLKERT, INTERIORS LEAD

DEBORAH NEMETH, INTERIORS LEAD

MILLA MUNDLE, INTERIORS LEAD

AMANDA WILLIAMS

LORI JAMES

SARAH DOORNBOS

KENDA DRAPER

RITSUKO SHIBUTANI


ELECTRICAL ENGINEERING 

MIKE NOWICKI, ELECTRICAL PROGRAM LEAD

CHRIS LANGE, ELECTRICAL ENGINEERING LEAD

HALEY SADLIER, ELECTRICAL ENGINEERING LEAD

HIKMAT GEORGES

JEFF BILEK

GEOF WRIGHT

NAOMI ADISA

NELSON SANTIAGO

KIM MORGAN

FAIROOZ ALAWAMI

RACHEL RITTER

MICHELLE KIM

SAM CIPKAR

YASH PATIL

DAN YENSCH

PAUL RANDALL

LOKMAN ABBAS

ALEX SHORKEY

ROBERT MELTON

KENZ MELIANI

JOSIE DOEFER

KELLY CERRI

LIGHTING DESIGN

REINHARDT SWART, LIGHTING PROGRAM LEAD

MAGGIE HILGENKAMP, LIGHTING DESIGN LEAD

MARIA DEL CASTILLO BERRIO

LUKE RENWICK

RODRIGO MANRIQUEZ

AMANDA BADGERO


MECHANICAL ENGINEERING
BRIAN NOONAN, MECHANICAL PROGRAM LEAD

NANCY KOHOUT, MECHANICAL ENGINEERING LEAD

ED PFANNES

KARAN MEHTA

JEFF SEGER

BRICE GASSER

GEORGIA ZOCHOWSKI

MEREDITH PENNEY

KEVIN HERTIG

JAE LEE

RIZKA APRILIA

DAVE KISTLER

CHRIS WINNIE

OSCAR COBB

BRAD REUTHER

SARAH WICKENHEISER

VICTOR BRACISZEWSKI

ALEC BARNES

BRITTANY FIEMA

KEVIN RICART

TALESE YENSCH

ERIC DIXON

PLUMBING ENGINEERING

LEAH BOSMA

MIKE ZOCCOLANTE

ROB TEIFER

FIRE PROTECTION ENGINEERING

STEVEN BARRETT

KEVIN BURDA

CAITLIN TURLIK

DAN CHUCHMAN

JIN CHEN

RACHEL ECKLEY

KYLE LEHMAN

ANDY OCHSANKEHL

JEYRA AROCHO

VIRAL AMIN

BIM + TECHNOLOGY IN PRACTICE

KEVIN KEELER

DANA DE FILIPPI

GRAPHICS

OLIVIA VENUTO

bottom of page